Mine haul-truck capacity is an important factor at primary crusher installations, because it is cost-effective to integrate truck cycle time at the crusher station with mine/shovel operations. If a primary crusher dump pocket is undersized and unable to handle the mines trucks, then operators must slowly meter the ore into the receiving hopper.gyratory crusher (3.94 m x 6.31 m 370 KW) reduces the run -of-mine (ROM) ore to about 80% passing 4 - 6 inches. The primary crushing crush an average throughput rate of 833 tonnes/hour to supply the secondary crusher, in order to satisfy the mill feed requirements of 385 t onnes/hour. The addition of a